Prefab modular container house with glass doors for shop

                                     CONTAINER HOUSELow cost prefabricated building container house for saleSizeLength2140/3105/4070/5035/6008/60

Featured Products

                                     CONTAINER HOUSE

Low cost prefabricated building container house for sale

Quick Built and Affordable 20feet Container House for Labor/Army/Mining Camp
Quick Built and Affordable 20feet Container House for Labor/Army/Mining Camp
Quick Built and Affordable 20feet Container House for Labor/Army/Mining Camp

SizeLength2140/3105/4070/5035/6008/6058/6950mm
Width2438/3000mm
Height2600/2800/3000/3200mm
Clear height indoor2265/2465/2665/2865/3065mm
Standard accessory 
Roof System
Top structure (corruaged color stee roofing + 100mm glass wool insulation + color steel ceiling)
 
 
Chassis System
steel struction chassis + 18mm thickness cement-fiber board + 2mm thickness PVC floor sheet (glass wool insulation for optional)
Permitted loading:>2.5KN/m2
 
Wall System
50/75/100mm EPS sandwich panel, rock wool sandwich panel,glass fiber sandwich panel, or PU sandwich panel
Door SystemSteel door / Fire-proof door / Sandwich panel door
Window SystemAluminum alloy shutter window and the plastic-steel window, single or double glass
Floor SystemPVC, plywood or customized
OptionDrainage systemProvided plan, design and constrution
Electric systemProvided plan, design and constrution
Technical parameterResistant temperature-40ºC to 40ºC
Wind resistance210km/h
Earthquake resistanceGrade 8

Quick Built and Affordable 20feet Container House for Labor/Army/Mining Camp
Quick Built and Affordable 20feet Container House for Labor/Army/Mining Camp
Quick Built and Affordable 20feet Container House for Labor/Army/Mining Camp
1.Contact us
 

2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal for your container house project.

3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.

4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.

5.Inspection
QC team will make routine inspection in each process,and provide inspection report.

6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.

7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.
 

8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.

FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers' request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff's health and safety.

2.What's your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 15 days after receive deposit. Large order delivery time should be arranged separately.

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

4. How to deal with quality problems?

Warranty is 2 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of container house steel frame is 20 years

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.

Amber Sun  Sales Manager
Tel:+8618057525019
 
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours